We – EPG Group the bigge EPT Chain and agricultural gearbox factory in China with 5 diverse branches. For more information: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
C45 Gear Rack for Glass cutting machine
1. Description
The company owns the world’s prime processing gear, specialised in the manufacturing of higher precision grinding equipment rack.The precision of grinding tooth rack can achieve the German normal DIN3962 of degree 5. The module m1-m22 and the duration can reach 2.5 meters.
two. People
High precision:Feed precision and positioning precision approximate the precision of the screw. |
Reduced sounds and vibration:No unpleasant tapping and rolling audio when higher precision grinding gear rack meshing. |
Extended length and high velocity can be recognized: prolonged length transmission can be understood, and large-speed motion above 200m/min can be carried out. |
Substantial bearing capacity: the max allowable bearing potential of large precision grinding equipment rack is about 2-3 times than precision milling rack. |
3. Specialized Information
Code | Module | L | Tooth No. | B | A0 | A1 | D | I | Hole No. | A | C1 | C2 | E | D1 | I1 | C3 | ||
CSTGH | 571 | 05 | 1 | 499.51 | 159 | fifteen | fifteen | 14 | – | – | – | – | – | – | – | – | – | – |
CSTGH | 015 | 05 | 1.5 | 499.51 | 106 | 19 | 19 | 17.5 | 62.44 | 124.nine | 4 | 8 | 7 | 11 | 7 | 29 | 441.5 | 5.seven |
CSTGH | 015 | 10 | 1.5 | 999.03 | 212 | 19 | 19 | 17.5 | sixty two.forty four | 124.nine | eight | 8 | 7 | 11 | 7 | 29 | 941. | 5.7 |
CSTGH | 571 | 05 | two | 502.sixty five | 80 | 24 | 24 | 22 | sixty two.eighty three | a hundred twenty five.7 | 4 | 8 | seven | eleven | seven | 31.three | 440.1 | 5.7 |
CSTGH | 571 | ten | 2 | 1005.31 | a hundred and sixty | 24 | 24 | 22 | 62.eighty three | one hundred twenty five.7 | 8 | eight | seven | 11 | 7 | 31.3 | 942.7 | 5.seven |
CSTGH | 030 | 05 | three | 508.ninety four | 54 | 29 | 29 | 26 | 63.sixty two | 127.2 | four | 9 | ten | fifteen | 9 | 34.4 | 440.1 | 7.7 |
CSTGH | 030 | ten | 3 | 1017.88 | 108 | 29 | 29 | 26 | sixty three.62 | 127.two | eight | 9 | ten | fifteen | 9 | 34.four | 949.one | 7.7 |
CSTGH | 040 | 05 | four | 502.65 | 40 | 39 | 39 | 35 | 62.eighty three | 125.seven | 4 | twelve | ten | 15 | nine | 37.five | 424.seven | seven.seven |
CSTGH | 040 | 10 | four | 1005.31 | 80 | 39 | 39 | 35 | 62.eighty three | a hundred twenty five.7 | 8 | twelve | ten | 15 | nine | 37.five | 930.three | 7.7 |
CSTGH | 050 | 05 | five | 502.sixty five | 32 | 49 | 39 | 34 | 62.eighty three | one hundred twenty five.7 | four | twelve | 14 | twenty | 13 | thirty.one | 442.four | 11.seven |
CSTGH | 050 | ten | five | 1005.31 | sixty four | 49 | 39 | 34 | sixty two.eighty three | one hundred twenty five.7 | eight | twelve | 14 | twenty | 13 | thirty.1 | 945. | 11.7 |
CSTGH | 060 | 05 | six | 508.94 | 27 | 59 | forty nine | 43 | sixty three.sixty two | 127.two | 4 | sixteen | eighteen | 26 | 17 | 31.4 | 446.1 | 15.seven |
CSTGH | 060 | 10 | 6 | 1017.88 | fifty four | fifty nine | 49 | 43 | sixty three.sixty two | 127.2 | eight | 16 | 18 | 26 | 17 | 31.four | 955. | fifteen.7 |
CSTGH | 080 | 05 | eight | 502.65 | twenty | seventy nine | seventy nine | seventy one | 62.eighty three | a hundred twenty five.7 | four | 25 | 22 | 33 | 21 | 26.6 | 449.five | 19.7 |
CSTGH | 080 | ten | eight | 1005.31 | forty | seventy nine | 79 | 71 | 62.eighty three | 125.7 | 8 | 25 | 22 | 33 | 21 | 226.six | 952. | 19.seven |
CSTGH | a hundred | 10 | ten | 1005.31 | 32 | ninety nine | 99 | 89 | 62.eighty three | one hundred twenty five.7 | 8 | 32 | 33 | forty eight | 32 | one hundred twenty five.seven | 754. | 19.seven |
CSTGH | one hundred twenty | 12 | twelve | 1017.9 | 27 | one hundred twenty | a hundred and twenty | 108 | 63.6 | 127.2 | 8 | 40 | 39 | 58 | 38 | 127.two | 763.4 | 19.7 |
four. pictures
five. Purchase approach
a. Customer sends us the drawing or sample, If only sample, our firm provide the C EPT drawing.
b. Our firm materials the processing method and quotation.
c. Our firm supplies the sample after customer confirmed processing approach and quotation.
d. Client spots the purchase soon after verify the sample.
e. Customer pay out 50% deposit
f. Amount generation.
g. Spend the stability after the acceptance and confirmation.
h. Shipping and delivery.
The use of authentic tools manufacturer’s (OEM) portion figures or trademarks , e.g. CASE® and John Deere® are for reference needs only and for indicating solution use and compatibility. Our firm and the detailed substitute parts contained herein are not sponsored, authorized, or made by the OEM.