EPG has been successfully certified by ISO9002 Good quality Management Program, ISO9001 Top quality Administration Program, API certificate, ISO/TS16949:2002 and ISO10012 measurement management method. EPG will always adhere to it organization spirit of currently being useful, modern, effective and superb to make the top global transmission drive. our goods are selling nicely in the American, European, South American and Asian marketplaces.
Overview
Rapid Specifics
- Gearing Arrangement:
-
Helical
- Output Torque:
-
450—480000NM
- Input Speed:
-
1450/960rpm
- Output Pace:
-
1.5-1200rpm
- Location of Origin:Zhejiang, China
- Manufacturer Title:
-
OEM
- Mounting Placement:
-
Foot Mounted
- Bearing:
-
C ampU,LYC,ZWZ
- Certification:
-
ISO9001:2008
- Housing:
-
Welding or Casting
Offer Capability
- Supply Ability:
- 3000 Unit/Models for each Thirty day period
Packaging Shipping and delivery
- Packaging Specifics
- Wooden packing containers , Cantons packed in 1 pallet
- Port
- Ningbo Port, Zhejiang Port
Online Customization
Electric powered motor reduction speed reducer with variable gearbox cylindrical equipment reducer
Product Description
nbsp
Item Application
Gearbox with difficult tooth surface area includes parallel shaft and vertical shaft sequence. Parallel shaft sequence is produced according to countrywide normal (JB/T 8853-2001). It consists of 4 sequence of ZDY(solitary phase), ZLY (two-stage), ZSY (3-stage), ZFY (4-phase). Vertical shaft collection is manufactured according to national common (JB/T 9002-1999) and employed as driving unit that has vertical arrangement of input and output shaft, and involves three series of DBY (2-phase), DCY (three-stage), DFY (4-stage).
Technical specs
1.Lengthy perform lifestyle nbsp
two.Running Efficiently nbsp
three.Reduced nosie nbsp
4.High efficiency nbsp
5.10 a long time producing experience
Organization Information
nbsp
Certifications
nbsp
Our Solutions
nbsp
At any time-power
nbsp
FAQ
: Are you trading firm or company ?
A: We are factory.
Q: How prolonged is your delivery time?
A: Usually it is 5-10 times if the products are in inventory. or it is fifteen-twenty times if the items are not in stock, it is according to amount.
Q: Do you give samples ? is it free or further ?
A: Indeed, we could provide the sample for free demand but do not pay the price of freight.
Q: What is your conditions of payment ?
A: Payment lt=1000USD, a hundred% in progress. Payment gt=1000USD, thirty% T/T in advance ,stability ahead of shippment.
If you have an additional concern, pls feel free of charge to get in touch with us as under:
Contact us
nbsp